Our team has been hard at work! This is a big project. First the concrete was removed, then a layer of rock added to address drainage issues and bring the new patio up the the level of the existing lawn. Then a layer of compacted sand, and finally the flagstones.
IMG_0994

The boxes had to be sanded and sealed, then a layer of sealant added to the stones as well. 

IMG_1010 (1)

Finally, we’re ready to add irrigation between the stones and in the boxes, add the ground cover and fill it with soil. We can’t wait for planting!